Bathroom InstallationYour Dream Bathroom.
Full bathroom fitting from strip-out to final fix. We supply and fit complete bathroom suites, walk-in showers, wet rooms and ensuites - all plumbing, tiling and finishing included.
What We Do
Our experienced engineers deliver reliable, professional service every time.
Full Bathroom Strip-Out
Complete removal of your existing bathroom suite, including disposal of old fixtures, fittings, tiles and flooring.
Toilet & Basin Installation
Supply and fit of close-coupled, back-to-wall or wall-hung toilets and basins. All waste and supply connections included.
Bath & Shower Tray Fitting
Installation of standard, freestanding and P-shaped baths and shower trays. Waste and overflow connections installed.
Walk-In Shower Installation
Supply and fit of walk-in shower enclosures with thermostatic valves, rainfall heads and floor-level trays.
Wet Room Conversion
Full wet room conversion including tanking, linear drain installation and designer shower systems.
Tiling & Waterproofing
Full tiling service using waterproofing membrane, adhesive, grout and sealant. All wall and floor tiles fitted to spec.
Pricing
Clear, fixed prices with no hidden fees or call-out charges.
- Remove old suite
- Fit customer-supplied suite
- Re-connect plumbing
- Mastic & finishing
- New suite supplied & fitted
- Full tiling
- New flooring
- All plumbing & waste connections
- Full wet room conversion
- Tanking & waterproofing
- Designer shower system
- Linear drain, full tiling & finishing
Planning Your New Bathroom
A bathroom installation involves more than fitting new fixtures. Getting the groundwork right first is what makes the finished room work properly for years.
Layout and Space Planning
We plan the layout around your space and how you use the room, keeping pipe runs sensible and the room easy to move around in.
Plumbing and Drainage Moves
Moving a toilet, shower or bath means rerouting supply and waste pipework - we plan this early so it doesn't cause delays mid-job.
Waterproofing (Tanking)
Wet areas are properly tanked and waterproofed before tiling, protecting the structure from water damage long after the job is finished.
Electrics and Extraction
Bathroom electrics, lighting and extraction need to meet Part P and building regulations - we handle this as part of the installation.
Fixture and Fitting Choices
We advise on baths, showers, taps and finishes that suit your budget and how the bathroom will actually be used day to day.
Timeline and Disruption
Most full bathroom installations take one to two weeks depending on scope - we agree a clear timeline with you before work starts.
Frequently Asked Questions
What to Expect on Installation Day
We protect access routes and flooring before work starts, and keep the site tidy throughout the job rather than leaving mess until the end. You'll know in advance roughly how long each stage will take.
Once the first fix plumbing and electrics are in, we tank and waterproof the wet areas before any tiling begins - this is the stage that protects your bathroom from water damage for years to come.
On completion we test everything - taps, shower, toilet flush and drainage - before we consider the job finished, so nothing gets missed.